Back to commercialCASE STUDY
National Logistics Fleet
120 DC40 units across 14 UK depots, fully load-balanced.
CLIENT - UK-wide logistics operator
THE CHALLENGE
A national parcel and logistics operator was electrifying 600+ vans across 14 regional depots and needed reliable overnight charging without overloading existing site supplies. Each depot had different grid headroom, mixed vehicle dwell times, and tight 04:00 dispatch windows.
THE SOLUTION
How we delivered.
Site-by-site DNO surveys and load profiling for all 14 depots
120 DC40 dual-output units deployed with intelligent load-balancing
Centralised OCPP 2.0.1 back-office for fleet-wide visibility
Phased install completed in 18 weeks with zero operational downtime
THE RESULTSOutcomes that
Outcomes that
speak for themselves.
120
DC40 units deployed
14
UK depots live
99.7%
Uptime - first 12 months
Have a similar project?